Renewal of piping systems and equipment / Refinery Porvoo

Customer: Neste Oyj

Country: Finland
Period:   December 2014 – June 2015  
Shut Down: 19. April 2015 - 24. May 2015

Services during pre-turnaround and turnaround:

  • Fabrication, installation, pressure testing of 550 pipelines incl. supports and fittings (approx. 260 t)
  • Installation of equipment incl. pumps and columns (approx. 250 t)
  • Steel construction (approx. 80 t)
  • Material SA106B and SA333-6, SA335-P5 and SA335-P9, stainless steel TP316L
  • Coating and thermal insulation of piping systems
  • Electric equipment and instrumentation, electric trace heating
  • Total hours: 150.000 productive 
[Translate to English:] tausch von Rohrleitungen und Ausrüstung „PHCT-PHDF / PL3 TA 2015“