Modification evaporation facility / Austria

Customer: Zellstoff Pöls AG

Services:

  • Supply and installation of the evaporation facility incl. piping 
  • Material: 1.4301
  • Dimensions: DN15 up to DN2300
  • Equipment installation
  • Anti-vacuum valve
  • Pumps
  • Tanks
  • Engineering, supply and installation of steel construction 
  • Total installation weight: 283 t

Period: March – December 2008

Print