Customer: Zellstoff Pöls AG

Services:

  • Supply and installation of the overall piping system
  • Dimensions: DN15 up to DN1000
  • Material: 1.4301
  • Equipment installation
  • Heat exchanger
  • Pumps, etc.
  • Engineering, supply and installation of steel construction
  • Total installation weight: 64 t

Period: December 2007 – May 2008