External pipelines recovery boiler 4 / Austria

Customer: Mondi Frantschach GmbH

Services:

  • Supply, fabrication and installation of the external pipelines for recovery boiler 4 incl. pipe bridge steel construction, primary and secondary supports and approx. 50 integrations during the shutdown in the year 2012

Length of pipeline system: 3.500 m

Weight pipe bridges and secondary steel construction: 130 to

Material: 10CrMo910, 16Mo3, P235GH, 1.4301. 1.4571, 1.4436

Nominal size: DN 25 – DN 1000

Span width pipe bridges: 10,7 m, 18 m and 20 m

Period: March 2012 – April 2013