Customer: voestalpine Stahl Linz

Services:

  • Dismantling of all pipelines, supports, hoses and fittings
  • Supply, fabrication and installation of the whole cooling water- and media pipeline system incl. supports, corrosion protection and insulation
  • Supply, fabrication and installation of the whole hydraulic- and lubrication lines incl. supports and corrosion protection
  • Supply, fabrication and installation of the whole pipeline system for strain and ease incl. supports, corrosion protection and insulation 
  • Dismantling and installation of all fittings and measuring devices in the area of blast furnace A and fan centre 2
  • Dimension: DN8 - DN900
  • Material: 1.4571, P235GH, P355GH, E355+N, 16Mo3, 13CrMo44, 10CrMo910, P91
  • Pipeline system: 10.000 lfm
  • Built-in components: 5.000 pcs of fittings, 2.000 hoses, 4.000 couplings
  • Weight: 370 t
  • Manhours: 100.000
  • Period: November 2017 - October 2018
  • Shutdown: 100 days