Primary dedusting station Projekt Alchevsk / Ukraine

Fabrication

Voest-Alpine Industrieanlagenbau

Services:

  • Detail engineering, prefabrication and trial installation of 2 e-filter housings
  • Weight, total: 670 t
  • Length: 38,5 m
  • Diameter 12,6 m / 11,6 m
  • Fabrication of 240 pcs frames with installed spray electrodes
  • Weight, total: 100 t
  • Prefabrication and trial installation of 2 evaporation coolers
  • Weight, total: 250 t
  • Fabrication of support- and inspection steelwork
  • Weight, total: 300 t
  • Total fabrication hours: 23.000

Period: December 2005 – April 2006

[Translate to English:] Primärentstaubungsanlage Projekt Alchevsk

[Translate to English:]

Datenblatt

Print