Water-steam-cycle plant Salzgitter - „Kraftwerk 2010“ (Germany)

Customer: Salzgitter Flachstahl GmbH

Period:       2007 – 2010

Services:

  • Bilfinger Industrial Services was responsible for the functionality of the whole package from basic engineering via staff training up to commissioning
  • Pipeline, approx: 1.300 t
  • Number of pumps: 33 pcs
  • Valves: 3.250 pcs
  • Feed water pumps incl. drive motor incl. transformer and frequency converter: 4 pcs, 2,6 MW each
  • Steel construciton: approx. 150 t
  • Steam condenser, feed water tank, etc.: approx. 600 t
  • Material: P91, 16Mo3, P235GH, 1.4571, 10CrMo910

 

Responsibility for the functionality of the entire BoP package