Combined cycle power plant Leppersdorf (Germany)

Customer:  Sachsenmilch Leppersdorf GmbH

Period:       June 2013 – April 2014

Services:

  • Basic- and detail engineering, supply, fabrication, installation, commissioning and trial run of the whole pipeline system of the water-steam-cycle incl. the complete water treatment system
  • Length piping system: 3.000 m
  • Weight piping system: 50 to
  • Nominal sizes: DN 15 – DN 350
  • Supplied equipment for water-steam-cycle
    Reducing station, evaporative cooler, sound insulator, water treatment, pumps 
  • Material: 16Mo3, P235GH, 1.4541, 1.4571

 