Obervermuntwerk II

Customer: Vorarlberger Illwerke AG / Austria

Period:  2014 - 2018

Services:

  • Engineering, fabrication, supply and installation
  • Penstock: DN 6000, s = 10mm; L = 254m; thin wall with interior concrete ring; DN 4500, S = 33 - 41mm; l = 250m, conventional steel lining, DN 1900, S = 11 - 23mm, l = 1200m; elevated pipeline gallery
  • Manifold for 2 turbines and 2 pumps incl. bifurcators and T-pieces
  • Operating pressure: max. 49 bar
  • Material: S355ML, S690QL, Alform 700
  • Total weight: ~4.600 tonns

 

On-site fabrication in 1700 m height

Gallery

Contact:

Stephan Ebner

Stephan Ebner

Geschäftsbereichsleiter Hydropower
Bilfinger Industrial Services GmbH
Dieselstr. 2
4600 Wels
Österreich

Phone: +43 7242 406-379

stephan.ebner@bilfinger.com
Print