Power Plant: Traunleiten

Customer: Wels Strom GmbH / Austria

Period: 2017 – 2019

Services:

• Engineering, fabrication, delivery, installation and commissioning

• 4 Flaps (2 pcs 44 m x 2,25 m, 1 pc 16 m x 2,95m, 1 pc 3 m x 3,33 m)

• 3 roller gates 7 m x 4,9 m as well as 5 sliding gates

• 1 set turbine inlet stop logs 9 x 10,5 m

• Suction pipe stop log 6,75 x 5,14 m

• Various coarse racks, armour slots, bulkhead storage and steel lining

• Total weight ~350 t

 