Modification Piping – Reverse Flow Wallbach, Lostorf and Verdichterstation Ruswil / Switzerland

Gas storage and distribution

Customer: Transitgas AG

Services: 

  • General contractor for civil engineering, pipe construction and electrical design
  • Engineering, part shipment, installation and insulation
  • TIE-IN seams: DN 650 - 1200
  • Diameter: DN 25 - 1200
  • Wall thicknesses: up to 37,4 mm
  • Material: L245, L415, STE445.7 TM, P460NL1
  • Design: DP = 75 bar, DT = 75 °C
  • Factory produced adaptors: DN 650 – 1200 / s=37,4 mm

Installation period: March – November 2017
Integration phase: 18 days