Gas Boiler Station WERNDORF

 

Customer:   Verbund Thermal Power GmbH & Co KG

Country:   Österreich
Period:   September 2017 - November 2018

 

Services:

• General contractor for process, engineering, fabrication, supply, installation, commissioning and trial run

• 3 hot water boilers and exhausts with 32,5MW power

• 6 natural gas burners 7,5 MW each, NOx limit 80 mg/Nm³

• Chimney and sound insulation equipment 3 x 1100mm, height 50 m, Ø3,6 m

• Gas reducing station 10.000 Nm³/h, 70 bar to 4 bar

• 1850 m piping, DN25 – DN600, 3200 welded seams

• 8 circulation pumps, ca. 970 measuring points

• Electrics

• Software, automisation, visualisation Siemens T3000

• Fire detection system, electrical building services

• Air condition, fans for pump room and low voltage rooms

Complete interface function by BIS

 

Print