District Heating Distribution Chur

Customer: IBC Energie Wasser Chur (Switzerland)

Period: April 2010 – September 2011

Services:

  • Engineering, supply,  installation and post-insulation, without house connections
  • Track length: 9,2 km; main track DN 200 – DN 300
  • 550 m stubs up to DN 150
  • Material: P 235 TR1

 

Gallery

Contact:

Rudolf Prinz

Rudolf Prinz

Teamleader Underground Piping

Phone: +43 7242 406 318

rudolf.prinz*Please remove text between *, this is a spam protection*@bilfinger.com
Print