District heating pipeline Wels (Austria)

Customer: AVE Österreich GmbH

Period: April – September 2008

Services:

  • Engineering, supply, installatikon and post-insulation 
  • District heating grid (integration of waste heat)
  • Track length: 4,8 km
  • Diameter: DN 400 / 300
  • Material: St 37.0
  • Pre-insulated pipes

 

Gallery

Contact:

Rudolf Prinz

Rudolf Prinz

Teamleitung Tiefrohrleitungsbau

Phone: +43 7242 406 318

rudolf.prinz@bilfinger.com
Print